Rapid Response Crew Available

Specialty Fiber Splicing & Testing Services

Precision fiber optic splicing, OTDR testing, and emergency restoration. 6+ years experience with industry-leading equipment.

Single & Ribbon Fiber Fusion Splicing
OTDR, OLTS & Power Meter Testing
Emergency Restoration
Auditing & Documentation

Need splicing or testing? Click "Mobilize a Crew" to get started. Looking for W2 or contract work? Click "Apply for Work".

6+Years Experience
LicensedGL, WC & Auto Insured
OSHA 10Certified

OUR SERVICES

Specialty Fiber Splicing & Testing

Precision fusion splicing, comprehensive testing, and complete documentation. All work performed with industry-leading Fujikura and EXFO equipment.

Single Fiber Fusion Splicing (Core Alignment)

Precision core-alignment fusion splicing performed with a Fujikura 70S+ Fusion Splicer to ensure ultra low-loss, high-reliability connections.

Ribbon Fiber Fusion Splicing

Fusion splicing performed with the Fujikura 90R Fusion Splicer for both ribbon and single-fiber applications with our ribbonizing capability.

OTDR, OLTS & Power Meter Testing

Comprehensive fiber testing and certification using professional EXFO test equipment, including the EXFO FTB-4 Test Platform and EXFO MaxTester Series.

As-Built Documentation & Closeout Packages

Professional closeout documentation including OTDR and OLTS reports generated with FastReporter, detailed as-built records, splice documentation, and photo verification for complete project deliverables.

Emergency Restoration & Cutovers

24/7 emergency response for fiber cuts, outages, and network damage. Rapid restoration, planned cutovers, and critical maintenance to minimize downtime and restore service quickly.

Field Auditing

Field auditing of fiber enclosures to verify splicing and labeling. Information is recorded to support accurate as-built records, with corrective cleanup performed as needed.

Need Underground, Aerial, or Other Services?

We know a guy. (Or ten, actually.)

While fiber splicing is our specialty, we have strong partnerships throughout the telecommunications industry. If you need underground construction, aerial installation, or any other related services, we're happy to connect you with trusted specialists who can help.

Equipment & Qualifications

Industry-Leading Equipment & Expertise

We invest in the best equipment and maintain the highest professional standards to deliver superior results on every project.

Fusion Splicers

  • Fujikura 70S+ (Core Alignment)
  • Fujikura 90R (Ribbon Splicer)
  • Fujikura 41S (Drop Splicer)

Testing Equipment

  • EXFO FTB 4
  • EXFO Max Tester
  • EXFO FIP

Bucket Truck & Splicing Lab

  • Ford F-450 Bucket Truck with Altec Lift
  • Mobile Fiber Splicing Lab

Fully Insured

GL, WC, and Auto Insurance

OSHA 10

Safety Certified

6+ Years

Industry Experience

Fujikura 70S+ - Core Alignment Splicer
Fusion Splicers

Fujikura 70S+

Core Alignment Splicer

Fujikura 90R - Ribbon Splicer
Fusion Splicers

Fujikura 90R

Ribbon Splicer

Fujikura 41S - Drop Splicer
Fusion Splicers

Fujikura 41S

Drop Splicer

Fujikura CT50 - Precision Cleaver
Cleaver

Fujikura CT50

Precision Cleaver

EXFO FTB-4 Pro - OTDR
Testing Equipment

EXFO FTB-4 Pro

OTDR

EXFO MaxTester - OTDR
Testing Equipment

EXFO MaxTester

OTDR

EXFO FIP-435B - Fiber Inspection Probe
Testing Equipment

EXFO FIP-435B

Fiber Inspection Probe

EXFO FIP-500 - Wireless Inspection Probe
Testing Equipment

EXFO FIP-500

Wireless Inspection Probe

F-450 Bucket Truck - Altec Lift
Bucket Truck

F-450 Bucket Truck

Altec Lift

Fiber Splicing Lab Interior - Mobile Clean Room
Fiber Splicing Lab

Fiber Splicing Lab Interior

Mobile Clean Room

Our Work

See Our Portfolio

Examples of our work including fusion splicing, enclosure installations, and cable prepping. Our crews have experience working with a wide range of industry-standard fiber enclosures and hardware.

Apex X2 288ct Ribbonized - Image 1
New Build
288ct
7

Apex X2

288ct loose tube butt splice completed in an Apex X2 enclosure at a hut-to-field transition point. Fibers were labeled per project specification and organized within the splice modules to clearly identify each splice. The enclosure was installed in an underground vault upon completion.

288ct CableButt SpliceLoose TubeUndergroundRibbonized
Apex X2 Meet Me Point - Image 1
New Build
48ct
5

Apex X2

Mid-sheath entry performed on a 48ct loose tube cable and installed in an Apex X2 enclosure serving as the network meet me point for handoff to the long-haul provider supporting the co-op network. Fibers were spliced and organized within the splice modules, with designated spare fibers coiled through the center of the tray according to project specifications. Upon completion, the enclosure was secured inside an underground vault.

48ct CableMid-SpanMeet PointLoose TubeUnderground
Apex X2S Splitter - Image 1
New Build
48ct
4

Apex X2S

48ct cable and MST's installed in an Apex X2S enclosure with a 1x32 splitter added into the tray. Loose tube fibers were ribbonized to allow fast and efficient ribbon fusion splicing. Fibers were labeled per project specification and organized within the splice modules. The enclosure was installed in an underground vault upon completion.

48ct CableSplitterLoose TubeUndergroundMSTs
CommScope 450D 1x16 Splitter - Image 1
New Build
144ct
3

Commscope 450D

Mid-sheath entry performed on a 144ct cable and installed in a CommScope 450D enclosure with a 1x16 splitter added into the tray. Loose tube fibers were ribbonized to allow fast and efficient ribbon fusion splicing. Fibers were labeled per project specification and organized within the splice modules. The enclosure was installed aerially using pole-mount hardware with Deltec securing the cables at each corner.

144ct CableSplitterMid-SpanLoose TubeAerial
Commscope 450D Splitter and MUX - Image 1
New Build
5

Commscope 450D

CommScope 450D enclosure installed to integrate an FTTH OLT and serve as a distribution point within the network. Multiple fiber cable types and counts were prepared and spliced within the enclosure, including both ribbon and loose tube fiber. Ribbon fibers were deribbonized and spliced individually where required. The enclosure incorporated multiple splitter types including one 1x2 splitter, two 1x32 splitters. Additionally two 4-channel muxes were installed for the OLT. Fibers were carefully routed, labeled, and secured within the splice trays according to project specifications. Upon completion, the enclosure was installed within an underground vault.

SplitterMUXLoose TubeRibbon FiberUndergroundDeribbonizing
Commscope FOSC-600 - Image 1
New Build
288ct
5

Commscope FOSC-600

Mid-sheath entry performed on a 288ct cable and installed in a CommScope FOSC-600 enclosure with a 1x32 splitter added into the tray. Loose tube fibers were ribbonized to allow fast and efficient ribbon fusion splicing. Fibers were labeled per project specification and organized within the splice modules. The enclosure was installed aerially using pole-mount hardware with Deltec securing the cables.

288ct CableSplitterMid-SpanLoose TubeAerialRibbonized
2 port Commscope OTE - Image 1
New Build
48ct
6

2 port Commscope OTE

Commscope OTE installed to support future FTTH service drops within the build. Fibers were properly routed and secured within the enclosure, with splice management completed according to project specifications. The enclosure was installed aerially on strand using Deltec per project specification without the use of snowshoes.

48ct CableLoose TubeAerial
AFL LG 350 - Image 1
New Build
144ct
7

AFL LG 350

144ct loose tube butt splice completed in an AFL LG350 enclosure. Fibers labeled per project specification using Sharpie to identify the fibers spliced within each splice module. Enclosure mounted aerially using pole-mount hardware with Deltec installed to secure the cable.

144ct CableButt SpliceLoose TubeAerial

View our Portfolio

View All Projects